Bonecutter Farm Project by Loyd Bonecutter

This is the longer version showing more intermediate pictures

A few pictures of the farm project
Little background: Property settled by my great grandfather Lycurgus Mathews in the 1870s, and purchased from his estate by my parents in the late 1940s.

Thelma Grace (Ward) Bonecutter (my mother) was raised by Lycurgus and Roxane (her grandparents) in this house then resided most of her adult life,
after college and WW II so resided here an estimated 60 years.

Eugene and Thelma Bonecutter moved to the farm in the late 1940s and upgraded the house with a concrete block foundation, hot water heating and electrical service.
In 1950 the barn was constructed on the location of a log cabin that was used for the barn at that time.  John Leslie (b 1945), Loyd Earl (b 1950) and Mary Martha (b 1954) were raised at this location.

John Leslie Bonecutter (my older brother) moved into this house in the late 1940s and lived there until about 1980, sans College and Army time.
Mary Martha Bonecutter (my yonger sister) has resided in this house most of her life since 1954, and moved out July 21, 2015 to her new residence.

April 1, 2017 Eric Dirkes' drone picture of Lycurgus Farm
March 11, 2016 picture of sunrise behind the Lycurgus Farm from across the road.




Google Earth picture September 2014Google Earth April 2017
June 10, 2017 Droan overhead picture


Nov 28, 2014 Barn North End Before Changes
Barn West Side


Barn outside dimentions 36 ft. by 50 ft.  Overall the roof covering was watertight, but soon to be removed and replaced with a metal roof.
The silo on the right side was the oats bin added by dad in the early 50's.

December 8, 2013 south side of barn
August 18, 2016 South side barn with roof, end covered in metal, new doors and windows


 

Dec 10, 2014 Barn west side with Paul Ferry on a cold December day. 
Note damage to doors and Clinton County Disposal has not picked up the 20 cu yard dumpster.
West side outer doors were constructed easter weekend 2015 and door painted October 13, 2015

October 17, 2016 Overhead door was added

May 17, 2015 Milk room rotten door frame removed
Milk room door frame replaced with door added




May 25, 2015 Northeast door frame replaced with door added  Former main door leaning against building outside)

April 5, 2015 Southwest corner of barn with new roof and trees cut and missing door added (to be hung on hinges with lock set later) to milk room Milking room door not replaced yet.
Southwest corner of barn new roof and end covered in new metal.  Doors not painted yet

The silo/corn drier to the east of the barn was added in the late 1970s

January 31, 2015 New Year's weekend project hanging conduit for wiring in the Milk Room located on the southwest corner. Conduit through the Calf Stall located on the central west side - new outlet and light for room.


May 11, 2015 Tromp Shed Southwest corner  after a 20 cu yard dumpter of material removed September 12, 2016 At last cars in the Tromp Shed



August 17, 2016) Tromp Shed being cleared for renovation August 23, 2016 Ramps being removed from Tromp Shed


August 23, 2016 East ramp removed west ramp more difficult Removed ramp and apron removed from Tromp Shed


August 24, 2016 West ramp removed by JBT heavy extended fork truck Column footing in Tromp Shed

Column in place Tromp Shed August 25, 2016


August 25, 2016 Beam being placed in Tromp Shed
Beams in place and wood columns and their footers removed with dirt floor lowered for gravel in Tromp Shed




August 26, 2016 Gravel added and plastic sheeting Floor poured in Tromp Shed looking west from open doorway


August 30, 2016 Apron entrance to Tromp Shed

September 25, 2016 Wiring in conduit being added to Shop October 10, 2016 Wiring added to south wall of Shop

Overhead door with opener added October 17, 2016 Lighting added to outside November 5, 2016


October 24, 2016 Poor electrical connection repaired by Jones Electric All new T8 fixtures with LED bulbs added for illumination October 26, 2016

Mendards Display door added November 2, 2016 Uncle Bucks Mojo Box playing in barn November 12, 2016


Pile of dirt removed from Tromp shed

Farm House Project


Farm house size information


Farm House - West side along road (July 17, 2015) Roof covering added spring 2017 and siding June 1, 2018




April 5, 2015 Farm House - South side and south yard July 9. 2018 South end of house sided with electrical service moved underground

 


January 6, 2016 South yard clean up (REMC cut down two trees, due to close proximity to overhead electrical lines) South yard with lilac bush renoved and starting on the forsythia


April 2, 2016 South yard the dead Chineese Elm came down South yard the down Chineese Elm clean up with Niece and Nephew helping

Luckily the wind took the chineese elm tree to the south.  Pulled the roots with it saving a lot of time in clean up.



July 17, 2015  Aaron installing storm window south upper floor


Southeast corner - well house is small building with barn behind Siding added to all but the South side June 1, 2018




Farm House - Southeast corner - well house is small building with barn behind



Removed damaged studs and rock wool insulation below picture window
Replacement plywood and studs coming out to same thickness as native studs


Nov 30, 2014  North Side of house, showing Mary's cars and the overgrown Forsythia Bush that Emily helped me wrangle. Nearly full dumpster was debris from the Barn's tromp shed
August 10, 2015 North Side of house, well house and smoke house

 


October 13, 2015 New roof on smoke house and yard area cleaned up March 2017 Well House and Farm house with new roofs.  Note power washing of siding.



Back steps and patio condition with extra material due to interior renovation 2015
Patio had quite a footer poured with it requiring BobCat mounted jack hammer to remove


June 29, 2017 Old steps and patio removed
June 30, 2017 new pad poured



Landing frame being hung and leveled July 2, 2017
Decking on landing and stairs added



Sad shape of steps while concrete steps added on side entrance Summer 2016
Concrete steps dug out June 29, 2017 showing caps glued to steps for temporary repair


Side door steps easier to remove with BobCat June 29, 2017 Concrete walk poured June 30, 2017


Doorway landing and steps added to side door July 1, 2017 Siding added on the north side of house June 2018




Smoke House Project September 2015

Sept. 2, 2015 Smoke house south side after trees on south side cut down.
Smoke house north side note dumpster for old roofing materials and most of contents

Limbs were so close to the roofing paper, major damage occurred over time.  Original wood shake perlins had square cut nails probably from 1890s.  Added perlins had wire nails for second wood shake roof, then two layers of asphalt shingles.




Sept. 2, 2015  Inside of the smoke house before renovation

Sept. 3, 2015 Contents being sorted
Building emptied out and reconstruction beginning


Building emptied out and reconstruction beginning.  A few support rafters replaced.Sept 6, 2015 Perlins added to north side and roof going on



September 6, 2015 North side of roof completed
September 6, 2015 the hottest day of the year Aaron installing ridge cap



November 24, 2015  Door added and trim
(Door and rail from garage at Cropper farm)
July 2018 siding on north, east and south sides



Well House Project



June 10, 2016 removed outer siding on Well House
June 12, 2016 removing roofing material.  Also showing underlying siding on well house





June 20, 2016 Replace most roof rafters filled void with fiberglass insulation plus foam.
July 4, 2018 Siding the well house



Mary's shed purchaed from Clinton Central Shop Class at least 20 years ago
April 17, 2017 Shed siding replaced and trim boards renewed